MAKE-A-PROJECT Course

Work breakdown structure

Go back

The Work breakdown structure (organigramme des taches) is a tree made of your tasks.

  • the project is the root
  • then the branches are the direct task needed to do the node above
  • for each node, we will have
    • a duration
    • a cost (Man-days/money $)
    • the result expected (optional)
    • the resources needed (optional)

A basic version may look like this

PlantUML code above